Mobile
Log In Sign Up
Home > chinese-english > "engineering change effect date" in English

English translation for "engineering change effect date"

工程变更骚日期
工程变更生效日期


Related Translations:
date:  n.1.日期。2.时期;时代,年代。3.〔美口〕(和异性的)约会;〔美俚〕约会的对象。4.〔口语〕同日;本日。短语和例子make a date 定一个(会面的)日期。 She is his date. 她跟他有约会。 at an early date 日内。 bear date …载有(某某)年月日。 break [cut] the date 不遵守约会。 down to
dates:  达泰什日期时间枣椰子枣子
dated:  过期的有日期的, 陈旧的证明日期的注……日期注有日期的
date date:  日期
dating:  n.1.记日期。2.【商业】(支付的)延期日期。3.〔美国〕幽会。
date changed:  修改日期
Example Sentences:
1.Engineering change effect date
工程变更生效日期
2.Engineering change effect date
工程变更生效日期
Similar Words:
"engineering change" English translation, "engineering change (ec)" English translation, "engineering change activity" English translation, "engineering change capability" English translation, "engineering change control" English translation, "engineering change effect work order" English translation, "engineering change evaluation" English translation, "engineering change list" English translation, "engineering change mode flag" English translation, "engineering change notice" English translation